Risk Assessment Wizard

Create clear, professional risk assessments in minutes. List hazards, set measures and assign responsibilities, then download a clean PDF branded with your organisation.

Get Started

  • Create a Risk Assessment
Land surveyor with equipment on construction site
Construction & Trade

Surveying and Land Measurement Risk Assessment Template

The complete guide to creating professional risk assessments for surveying and land measurement work.

Free to use Instant PDF download Updated February 2026

The essential guide to surveying safety

Surveying and land measurement work involves fieldwork across diverse terrains and environments. From construction sites to remote locations, surveyors face unique hazards including uneven ground, traffic exposure, and often work alone.

This guide covers everything you need to create a thorough surveying risk assessment—from terrain hazards and equipment handling to lone working protocols and interaction with live construction sites.

Surveyor using theodolite equipment
Trade & Construction

Why professional surveying matters

Accuracy

Provides precise measurements essential for construction projects.

Legal Compliance

Establishes legal boundaries and property lines.

Project Foundation

Forms the basis for architectural and engineering plans.

Risk Prevention

Identifies underground utilities and potential hazards.

Key hazards & control measures

Lone WorkingMedium Risk
Potential Harm

Delayed assistance in emergencies, vulnerability in remote locations.

Control Measures
  • Implement check-in procedures at set intervals
  • Carry charged mobile phone or radio
  • Share location and expected return time
  • Consider personal safety devices for remote areas
Traffic ExposureMedium Risk
Potential Harm

Vehicle strikes, collisions, equipment damage near roadways.

Control Measures
  • Wear high-visibility clothing at all times
  • Use traffic management where required
  • Position equipment away from traffic flow
  • Face oncoming traffic when working roadside
Weather ConditionsLow Risk
Potential Harm

Slips in wet conditions, hypothermia, heat exhaustion, equipment damage.

Control Measures
  • Check weather forecasts before fieldwork
  • Wear appropriate clothing for conditions
  • Carry emergency supplies for remote locations
  • Postpone work in severe weather

This guide covers the most common hazards. Our risk assessment wizard includes 34 hazards and 140+ control measures for Surveying and Land Measurement, sourced from industry guidance — create your assessment in minutes.

Surveying safety checklist

Pre-Survey Preparation

  • Site reconnaissance completed
  • Underground utilities identified
  • Access permissions obtained
  • Weather forecast checked
  • Lone working procedures in place

Personal Protective Equipment

  • Safety boots worn
  • High-visibility clothing worn
  • Hard hat available for site work
  • Weather-appropriate clothing

Equipment

  • Equipment inspected and calibrated
  • Batteries fully charged
  • Tripods and poles in good condition
  • First aid kit available

Communications

  • Mobile phone charged
  • Check-in schedule confirmed
  • Emergency contacts accessible
  • Location shared with office

Ready to create your surveying risk assessment?

Use our step-by-step wizard to generate a professional, compliant risk assessment in minutes.